About: XM2001 Crusader   Sponge Permalink

An Entity of Type : dbkwik:resource/t9ln_EbmcSHrBZziiWPG4g==, within Data Space : 134.155.108.49:8890 associated with source dataset(s)

The XM2001 Crusader was to be the United States Army's next-generation self-propelled howitzer (SPH), designed to improve the survivability, lethality, mobility, and effectiveness of the artillery as well as the overall force. It was initially scheduled for fielding by 2008. United Defense was the prime contractor; General Dynamics the major subcontractor. In early May 2002, Secretary of Defense Donald Rumsfeld cancelled the $11 billion USD program because he considered it neither mobile nor precise enough. The prototype SPH vehicle is on display at the cannon park at Fort Sill.

AttributesValues
rdf:type
rdfs:label
  • XM2001 Crusader
rdfs:comment
  • The XM2001 Crusader was to be the United States Army's next-generation self-propelled howitzer (SPH), designed to improve the survivability, lethality, mobility, and effectiveness of the artillery as well as the overall force. It was initially scheduled for fielding by 2008. United Defense was the prime contractor; General Dynamics the major subcontractor. In early May 2002, Secretary of Defense Donald Rumsfeld cancelled the $11 billion USD program because he considered it neither mobile nor precise enough. The prototype SPH vehicle is on display at the cannon park at Fort Sill.
sameAs
Length
  • 7.53 m
dcterms:subject
dbkwik:military/pr...iPageUsesTemplate
Speed
  • 39(xsd:integer)
Name
  • XM2001 Crusader
Caption
  • XM2001 Crusader firing a shell
Width
  • 3.31 m
primary armament
  • XM297E2 155mm cannon
Weight
  • 43(xsd:integer)
Height
  • 3.00 m
Engine
  • LV100-5 turbine engine
engine power
  • 1500.0
Suspension
  • torsion bar
is vehicle
  • yes
Crew
  • 3(xsd:integer)
abstract
  • The XM2001 Crusader was to be the United States Army's next-generation self-propelled howitzer (SPH), designed to improve the survivability, lethality, mobility, and effectiveness of the artillery as well as the overall force. It was initially scheduled for fielding by 2008. United Defense was the prime contractor; General Dynamics the major subcontractor. In early May 2002, Secretary of Defense Donald Rumsfeld cancelled the $11 billion USD program because he considered it neither mobile nor precise enough. The prototype SPH vehicle is on display at the cannon park at Fort Sill.
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2012 OpenLink Software