Process of 40-60 TPH Jaw & Impact Crushing Plant: Big materials are fed to the jaw crusher evenly and gradually by vibrating feeder through a hopper for primary crushing. After first crushing, the material will transferred to impact crusher by belt conveyor for secondary crush; the crushed materials will then transferred to vibrating screen for separating. After being separated, the parts that can meet standard will be taken away as final products, while the other parts will be returned to Cone crusher, thus forming a closed circuit. Size of final products can be combined and graded according to customer’s specific requirement. We can also equip dust catcher system to protect environment.
Attributes | Values |
---|---|
rdfs:label |
|
rdfs:comment |
|
dcterms:subject | |
abstract |
|