The depot has sufficient stabling for up to 24 tram sets, and a double track workshop with all required facilities to perform almost all maintenance. Additionally, system control is located within the building, as well as a base for the British Transport Police to monitor the network.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/1jHR-mIDzp3d1CinXfSSng== | 5.88129e-14 |
dbr:Therapia_Lane_depot | 5.88129e-14 |