The depot has sufficient stabling for up to 24 tram sets, and a double track workshop with all required facilities to perform almost all maintenance. Additionally, system control is located within the building, as well as a base for the British Transport Police to monitor the network.
Entity | Attribute | Value | Rank |
---|