The ground structure or roads used in METRo can be on of those four types: 1. * asphalt 2. * crushed rock 3. * cement 4. * sand (METRo version > 3.2.1) All layers thickness in RWIS station configuration file are in meters. In the case of road, a thickness of 20 meters of sand is added as last layer of material.
Graph IRI | Count |
---|---|
http://dbkwik.webdatacommons.org | 4 |