Construction began on 1 August 2011 with the first cutting of aluminum at Austal USA's Modular Manufacturing facility in Mobile, Alabama. The name of the ship was announced on 5 October 2011.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/C4dqxzOnVqKosiR77Uey_w== | 5.88129e-14 |
dbr:USS_Jackson_(LCS-6) | 5.88129e-14 |