Construction of the Thomas Paine was completed on reference stardate 2/9002, in the 2350s decade. This vessel was commissioned at one of the two shipyards that produced Paine-class vessels, either Deneva Shipyards or Gibraltar Shipyards. (FASA RPG module: Star Trek: The Next Generation Officer's Manual)
Identifier (URI) | Rank |
---|---|
dbkwik:resource/HGPFAs-grszGAFXw5Eb_8w== | 5.88129e-14 |