OpenLink Software

Usage stats on Long Beach Naval Shipyard

 Permalink

an Entity in Data Space: 134.155.108.49:8890

The Long Beach NSY industrial area encompassed of the total owned. There were 120 permanent, 39 semi-permanent, and 6 temporary buildings, for a total of 165 buildings. There were 17 different shop work areas and of covered building space. The shipyard had three graving docks, and five industrial piers. There were feet (3.8 km) of ship berthing space. Crane capacity ranged from to (portal) and from to (floating). The Long Beach NSY was placed in an inactive status on June 1, 1950. The Korean War began less than one month later. Reactivation of the shipyard was directed on January 4, 1951.

Graph IRICount
http://dbkwik.webdatacommons.org14
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] This material is Open Knowledge Creative Commons License Valid XHTML + RDFa
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 Unported License.
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Copyright © 2009-2012 OpenLink Software