an Entity in Data Space: 134.155.108.49:8890
The Titan III launch facilities at CCAFS were built as part of an Integrate-Transfer-Launch approach intended to enable a rapid launch rate. Titan vehicles were assembled and integrated with their payloads off-pad and then transported by rail to one of the two pads. The Titan III facilities included both LC-40 and LC-41, assembly buildings including the Vertical Integration Building, and the first rail line at the Cape. The facilities were completed in 1964 and the first launch from LC-41 was of a Titan IIIC, carrying four separate payloads, on December 21, 1965.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/Le1Lx47zbGCj0JORMdq2GQ== | 5.88129e-14 |
dbr:Cape_Canaveral_Air_Force_Station_Space_Launch_Complex_41 | 5.88129e-14 |