The ship was the first of 32 vessels of the Auk class ordered for transfer to Great Britain under Lend-Lease, and designated British Minesweeper HMS Akbar (BAM-1). Twelve of these ships were retained for service in the U.S. Navy. Launched on 12 December 1942 by General Engineering and Dry Dock Co., Alameda, California; redesignated USS Champion (AM-314) on 23 January 1943, and commissioned on 8 September 1943, Lieutenant Commander J. H. Howard, Jr., USNR, in command.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/R2S3f9XIhyngYRoGZQ9evg== | 5.88129e-14 |
dbr:USS_Champion_(AM-314) | 5.88129e-14 |