The Victory Yard was a temporary expansion of the General Dynamics Electric Boat facility in Groton, Connecticut to dramatically increase submarine construction during World War II.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/RITtE1U16qmBPPFOOzUILw== | 5.88129e-14 |
dbr:Victory_Yard | 5.88129e-14 |