Construction of the Michael Whelan was completed on reference stardate 3/0207, in the 2360s decade. This vessel was commissioned at one of the two shipyards that produced Paine-class vessels, either Deneva Shipyards or Gibraltar Shipyards. (FASA RPG module: Star Trek: The Next Generation Officer's Manual)
Identifier (URI) | Rank |
---|---|
dbkwik:resource/SuR0-rffSpmhCqP3MJCwMw== | 5.88129e-14 |