OpenLink Software

Usage stats on Striker Vehicle Controversy

 Permalink

an Entity in Data Space: 134.155.108.49:8890

In the 1990s the then Chief of Staff of the US Army, General Eric Shinseki, directed that the army would transform to meet future worldwide threats. The ultimate goal of this vision became the Army’s Future Combat System (FCS). However, it would be many years before this system would be in place. So, an interim solution using modified current production vehicles was created. This solution was called the Interim Brigade Combat Team (IBCT). (This was later renamed to Stryker Brigade Combat Team, or SBCT, after the Stryker vehicle was fielded.) The original FCS and IBCT goals were that the US Army would be able to deploy a brigade, anywhere in the world, within 96 hours. Also, the unit's vehicles should be transportable by C-130 to a range of 1,000 miles. After the Stryker was deployed, the F

Graph IRICount
http://dbkwik.webdatacommons.org7
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] This material is Open Knowledge Creative Commons License Valid XHTML + RDFa
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 Unported License.
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Copyright © 2009-2012 OpenLink Software