OpenLink Software

Usage stats on The Silo

 Permalink

an Entity in Data Space: 134.155.108.49:8890

The construction process required a three-story hole to be dug straight down into the earth, a 62 foot long steel reinforcement cage put in, and a cement tube to basically be built within. The missiles would be inserted and then a 110 ton steel and concrete plate would be put overtop of the assembly, armed with explosives to blow them off to make way for the launching missile. The sounds persisted every time maintenance workers entered the silo. Several men even reported the sounds of labored breathing and footsteps. It was mostly kept under wraps by base security. ...He was gripping a hammer.

Graph IRICount
http://dbkwik.webdatacommons.org13
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] This material is Open Knowledge Creative Commons License Valid XHTML + RDFa
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 Unported License.
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Copyright © 2009-2012 OpenLink Software