Construction of the Canadara was completed on reference stardate 2/9501, in the latter part of the 2350s decade. This vessel was commissioned at one of the two shipyards that produced Paine-class vessels, either Deneva Shipyards or Gibraltar Shipyards. (FASA RPG module: Star Trek: The Next Generation Officer's Manual)
Identifier (URI) | Rank |
---|---|
dbkwik:resource/gWPzz3l0pKpYmpCM0FME_Q== | 5.88129e-14 |