They were all demolished between February 2006 to July 2006 by Walter Forshaw Ltd. The contract value was £793,000. The demolition contractors were commissioned by Liverpool Housing Action Trust. The blocks were soft-stripped and subsequently demolished in their entirety using our Hitachi EX800 Super Reach demolition excavator fitted with a concrete pulverisor with 360o rotation. This form of demolition is known as high reach removal. The site was levelled and tracked over in preparation for the subsequent housing development.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/kQBKxzn6BKcaDKV5SSIY7w== | 5.88129e-14 |