The blocks were approved as two phases, known together as the Kents Moat Project. The first phase, which included three 8 storey flats with a total of 48 flats, was approved in 1955. The second phase was approved in 1956 and included a 7 storey block and a 6 storey block with 42 and 36 flats, respectively. The blocks were completed in 1959 by Wimpey using the no fines concrete construction method. The blocks consisted of 222 flats (74 x 1 bed and 148 x 2 bed). The Poolway shopping centre on the estate consisted of 33 retail units and 70 flats. To the west of the Poolway, The Lea Estate was constructed in the 1960s.
Graph IRI | Count |
---|---|
http://dbkwik.webdatacommons.org | 5 |