The last two tower blocks were demolished by Walter Forshaw Ltd between January 2003 and November 2003. Full height scaffolding with debris netting and boards to 3 floors at any one time was erected. Deconstruction of the 6 floors was undertaken using mini-excavators. Through propping to floors was installed for additional loads applied by the mini-excavators and debris. A crawler crane was utilised for lifting the floor panels and skips and lowering them to the ground.

Graph IRICount
http://dbkwik.webdatacommons.org4
Alternative Linked Data Views: ODE     Raw Data in: CXML | CSV | RDF ( N-Triples N3/Turtle JSON XML ) | OData ( Atom JSON ) | Microdata ( JSON HTML) | JSON-LD    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] This material is Open Knowledge Creative Commons License Valid XHTML + RDFa
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 Unported License.
OpenLink Virtuoso version 07.20.3217, on Linux (x86_64-pc-linux-gnu), Standard Edition
Copyright © 2009-2012 OpenLink Software