An extensive refurbishment was carried out on the tower during 2009 and 2010, with the replacement of windows, attachment of new insulation and cladding, the entire building painted white, and the installation of blue strip lighting around the top of the building.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/rY_VsnlI9BVHkS2tksWkRQ== | 5.88129e-14 |