This allows for the smelting of T4 ores by an Ore Smelter. This takes the place of Forced Induction upgrades and decreases the smelting speed of the smelter by 400%. This is the first usable method to smelt Chromium and Molybdenum Ore. This is mostly a temporary measure until a Blast Furnace can be built. Uses less ore per bar than the Blast Furnace.
Identifier (URI) | Rank |
---|---|
dbkwik:resource/sLAFPbBErlccqb5HOghZUQ== | 5.88129e-14 |