UB-5 was ordered in October 1914 and was laid down at the Germaniawerft shipyard in Kiel in November. UB-5 was a little more than in length and displaced between , depending on whether surfaced or submerged. She carried two torpedoes for her two bow torpedo tubes and was also armed with a deck-mounted machine gun. UB-5 was broken into sections and shipped by rail to Antwerp for reassembly. She was launched and commissioned there as SM UB-5 in March 1915.
Graph IRI | Count |
---|---|
http://dbkwik.webdatacommons.org | 34 |